S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 3000 | 6.05991 | 18179.73 |
2 | (II) 3.00 m to 4.50 m | 6620 | 15.84 | 104860.8 |
3 | (d) In Cement mortar 1:5 (1cement, 5sand) | 55 | 2891.94054545455 | 159056.73 |
4 | (a) Boulders | 28.8 | 541.789930555556 | 15603.55 |
5 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 432 | 390.728449074074 | 168794.69 |
6 | (a) Loose or soft soil for Tank Work, lift of up to 3m depth | 432 | 81.4880092592593 | 35202.82 |
7 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 224 | 21.5566071428571 | 4828.68 |
8 | a (iii) Loose or soft soil for Tank Work | 432 | 92.0814351851852 | 39779.18 |
9 | b (iii) Dense or hard soil for Tank Work | 2544 | 124.3 | 316219.2 |
10 | Collection of puddle earth including stacking at quarry | 656.4 | 167.854722730043 | 110179.84 |
11 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 1160 | 336.310603448276 | 390120.3 |
12 | Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed. | 224 | 68.2407142857143 | 15285.92 |