S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1500 | 1500 |
2 | Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva | 20 | 1200 | 24000 |
3 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 30 cm and not exceeding 100 cm | 8.5 | 1020 | 8670 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 1.5 | 2562 | 3843 |
5 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 49.5 | 1280 | 63360 |
6 | Providing and laying in foundation, plinth and under floors lime concrete with 40mm nominal size graded stone aggregates (metal) and 40% lime mortar. i/c ramming in layers and curing complete excluding cost of form work.-Lime mortar 1:1:1 (1lime putty, 1surkhi, 1sand) | 3.5 | 4916 | 17206 |
7 | Providing and fixing 30mm thick double leaf panelled, glazed or panelled and glazed shutters for doors, windows and clerestory window including black enamelled M.S. butt hinges with necessary screws.(half glazed and half panelled)-Other structural wood (seasond & chemicaly treated wood) | 21.5 | 1250 | 26875 |
8 | Preparing the base surface filling the cracks and pot holes whenever necessary with cement mortar(1:3) | 11.5 | 1400 | 16100 |
9 | Labour only for applying evenly a priming/ tack coat with the bituminous primer(bitumen 80/100) @ 10kg./10 sqm on WBM surface. | 1 | 1000 | 1000 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 15 | 1100 | 16500 |