S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 19.29 | 58.5178849144635 | 1128.81 |
2 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 4.89 | 3175.78118609407 | 15529.57 |
3 | (c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size) | 21.47 | 5309.57428970657 | 113996.56 |
4 | (I) 0.5 Km. Lead | 2165 | 99.9104018475751 | 216306.02 |
5 | (XXVIII) 45 Km. Lead | 22.5 | 100.562222222222 | 2262.65 |
6 | (XXVIII) 45 Km. Lead | 7.5 | 740.982666666667 | 5557.37 |
7 | (XV) 10 Km. Lead | 420 | 210.63430952381 | 88466.41 |
8 | (c) 600mm dia | 22.5 | 886.049333333333 | 19936.11 |
9 | (b) 1000 mm dia. | 7.5 | 3768.24 | 28261.8 |
10 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete. | 2611.13 | 17.3729036853776 | 45362.91 |
11 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complet compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete. | 2165 | 19.168337182448 | 41499.45 |
12 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complete compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete. | 420 | 24.0644523809524 | 10107.07 |
13 | Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7), i/c all leads and lifts of materials etc. complete. | 256 | 291.969921875 | 74744.3 |
14 | "Construction of Gravel Surface Course as per clause 402 of "Ministry of Rural Development, Specifications for Rural Roads-August, 2004" by an appropriate combination of natural gravel, river borne material and crushed metal in required proportions confirming to Grading requirements specified in clause 2.2.2.2 or clause 2.2.2.3 (Table 2.3, Material having Nominal Maximum Size 20 mm or 10 mm) of IRC:SP:77-2008, having Liquid Limit less than 40 and Plasticity Index 6-15 and strength of material not less than 20% CBR, including all leads and lifts of material etc. complete. The mixing shall be by Mix-in-Place method over prepared surface, spreading in uniform layers with tractor mounted grader or manually, watering at OMC and compaction by smooth wheeled/vibratory roller of 80 to 100 kN static weight to achieve 100% of MDD as per IS:2720 (Part-7)". | 120 | 468.504833333333 | 56220.58 |
15 | (A) With Reinforced cement concrete (ii) Ordinary Kilometer Stone (Pre cast) | 2 | 1617.6 | 3235.2 |
16 | Site clearance, cutting grass, raking into heaps and removing off the premises | 7200 | 2.6669125 | 19201.77 |
17 | a (i) Loose or soft soil for Road Work | 2611.13 | 100.975478049733 | 263660.1 |
18 | (b) Dense or hard soil | 19.29 | 148.333333333333 | 2861.35 |
19 | Collection of approved soil having CBR not less then 5, including stacking at quarry. | 2165 | 184.067958429561 | 398507.13 |
20 | Collection/Excavation of Graval Material meeting the requirements of Hard Moorum as detailed in RES SOR chaper 03 Notes Clause 3.2© including stacking and all leads and lifts up to loading point at quarry. | 420 | 211.54730952381 | 88849.87 |
21 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3644.01 | 3644.01 |