Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:35:12 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: RICHHARIKHURD(P)
Work Code: 1703004070/RC/22012034308202 (kharanja nirman rajendra singh ke makan se manfool ke makan ki or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/1/2016 Work start date : 22/3/2016
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 70/4680 Sanction Date : 16/3/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
908343 329315 0 0 0 0 0 330000 0 1237658
Financial Sanction Details
Financial\Administrative Sanction No: 70/042 Financial\Administrative Sanction Date 20/3/2016
Fin. Sanc. Amt. (in Rs) NREGA:1237658 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1238000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard150005000
2Dag-beling-Single spade stroke minimum 75mm deep10000.3300
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.2500226.1565250
4Transportation rates for Masonry stone.371.25413.98153690.075
5Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1365125170625
6Loading of metal in truck, dumper etc.136528.6239066.3
7Unloading of metal in truck, dumper etc.136514.3119533.15
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.114544.751181.5
9Collection of hard moorum including stacking at quarry.1365142.5194512.5
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.27501438500
Total Activity 1238000
S.NoMaterialQuantityUnit PriceTotal
1Display board150005000
2खण्‍डा परिवहन371.25413.98153690.075
3मुरम परिवहन (1)1365125170625
Total Material 330000