State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SUNWAHA
Work Code: 1711003056/WC/22012035025888 (Embakment ball mukti dham ke pas)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 17/8/2022 Work start date : 15/12/2022
Present status : Non-existent Proposed Status : Constr of Earthen contour Bund for Community
Tech Sanction Details
Technical Sanction No. : 1711003/2022-2023/192594/TS Sanction Date : 21/12/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
273425.4 191044.57 878.94 13631.04 0 0 0 206000 0 478979.95
Financial Sanction Details
Financial\Administrative Sanction No: 1711003/2022-2023/192594/AS Financial\Administrative Sanction Date 22/12/2022
Fin. Sanc. Amt. (in Rs) NREGA:479290 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
480000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(II) Lead upto 150 meters45677.800504385964935477.03
2(a) C.C. 1:2:4 (1cement, 2sand, 4metal)84208.7612533670.09
3Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.700101.70401428571471192.81
4(VI) 3.0 Km. Lead456169.58543859649177330.96
5Labour only for boulder soling hand packed excluding consolidation.456201.63609649122891946.06
6(b) Dense or hard soil468156.78745726495773376.53
7Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.456172.8978837.84
8Stacking of Gravel or Hard Moorum at site without Boxing.45623.328618421052610637.85
9Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13821.733821.73
Total Activity 477000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.8178761000817.876
20084-Hire charges of Diesel truck - 9 tonne (without POL)17.60322256210036966.767376
30297-Stone Aggregate(single size): 10 mm nominal size0.88630554.4
40367-Portland Cement2.7177512640017393.60768
50368-White cement 0.0003806156265.9472556
60983-Fine sand (zone IV)3.815546410253910.93506
71007-Structural steel such as tees, angles, channels and R.S. joists 7.34339623812059628.3773876
81235-Diesel oil146.9869083610014698.690836
93-Display Board / CIB130003000
105001-Mobil oil5.280966772701425.8610279
117900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
12MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT4.2255252218.125
13MR6032-Snowcem/ durocem0.00072662778920.1914874
14MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)1.7847901409.36
Total Material 144000