Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:59:37 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: MAKARLA
Work Code: 1725007078/RC/776 (पंच परमेश्‍वर रोड जौहर गिरधारी के मकान से दिनेश के म‍कान/कालू गणपत के मकान से बंसत के मकान तक माकरला)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 10/10/2012 Work start date : 10/12/2012
Present status : WBM Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 464z Sanction Date : 11/10/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
80000 53000 0 0 224000 0 0 277000 0 357000
Financial Sanction Details
Financial\Administrative Sanction No: 12118z Financial\Administrative Sanction Date 11/12/2012
Fin. Sanc. Amt. (in Rs) NREGA:133000 Panchparmeshwar
224000
Scheme 2
0
Scheme 3
0
Total
357000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Double spade "v" shaped stroke 100mm deep1290.451.6
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)863002.1258180.6
3Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used86108.79348.2
4False work for R.C.C. and P.C.C. work in plinth and foundation223147.432870.2
5Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)74.86.1456.28
6Collection of approved soil having CBR not less then 12, including stacking at quarry.84107.49021.6
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 846.5546
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 84.336.53076.95
9Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.73.120414912.4
10Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.139.9130.2718224.773
11Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.78421.31789.2
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work116.173.48521.74
Total Activity 357000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)539300161700
2Centering and Shuttering22387.5519523.65
3Convergence Amount170027002
4GITTI 20MM73.165047515
5mason perday123003600
6mixer machin (perday)126007200
7murrom8475.496341.16
8Photograph1025250
9POLYTHENE (CUM)2643.5924
10SAND36.9845016641
11Vibrator (Per Day)124004800
12बोर्ड115001500
Total Material 277000