Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:29:02 AM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: DANGICHA
Work Code: 1719006032/IF/22012035186398 (kapil dhara samuh kup prahlad amarsingh gp dangicha)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/8/2023 Work start date : 2/1/2024
Present status : Not Exist Proposed Status : Constr of Irrigation Open Well for Individuals
Tech Sanction Details
Technical Sanction No. : 1719006/2023-2024/4349/TS Sanction Date : 21/1/2024
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
117226.01 68130.42 66028.2 431.7 0 0 0 135000 0 251816.33
Financial Sanction Details
Financial\Administrative Sanction No: 1719006/2023-2024/4349/AS Financial\Administrative Sanction Date 22/1/2024
Fin. Sanc. Amt. (in Rs) NREGA:251816 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
252000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m57.0867.00735809390333824.78
2(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)6.1875689.6557297559435201.9
3(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars330.51390.384462940943329873.24
4(b) Dense or hard soil60.235173.06283722088510424.44
5(I)1.50 m. to 2.00 m.20.178234.5029239766084731.8
6(II)2.00 m. to 2.50 m.20.178246.2161760333044968.15
7(XVIII)10.00 m. to 10.50 m.7.257878.5476092049066375.62
8(XIX)10.50 m. to 11.00 m.7.257905.6428276147176572.25
9(XX)11.00 m. to 11.50 m.6.924932.7368573079156458.27
10(XXI)11.50 m. to 12.00 m.6.924959.8310225303296645.87
11(III)2.50 m. to 3.00 m.20.178584.04301714738811784.82
12(X)6.00 m. to 6.50 m.8.67978.3206459054218482.04
13(XI)6.50 m. to 7.00 m.8.67999.4475201845448665.21
14(XII)7.00 m. to 7.50 m.8.3051020.575556893448475.88
15(XIII)7.50 m. to 8.00 m.8.3051041.703792895858651.35
16(XIV)8.00 m. to 8.50 m.7.9481062.830900855568447.38
17(XV)8.50 m. to 9.00 m.7.9481083.958228485158615.3
18(XVI)9.00 m. to 9.50 m.7.5991105.086195552058397.55
19(XVII)9.50 m. to 10.00 m.7.5991126.21397552318558.1
20(IV)3.00 m. to 3.50 m.9.813870.2292876796098539.56
21(V)3.50 m. to 4.00 m.9.813887.6215224701938710.23
22(VI)4.00 m. to 4.50 m.9.424905.0148556876068528.86
23(VII)4.50 m. to 5.00 m.9.424922.4076825127348692.77
24(VIII)5.00 m. to 5.50 m.9.043939.799845184128498.61
25(IX)5.50 m. to 6.00 m.9.043957.1923034391248655.89
26Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9187.2977777777781685.68
27Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9261.2177777777782350.96
Total Activity 251000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.61871000618.7
20297-Stone Aggregate(single size): 10 mm nominal size1.36114650884.741
30325-Blasting powder78.069768564371.907008
40326-Blasting fuse (fuse wire)85.1228282383.4384
50367-Portland Cement1.97984640012670.976
60983-Fine sand (zone IV)2.7841510252853.75375
71005-Twisted steel/deformed bars3.4703865690023945.66685
83-Display Board / CIB110001000
97335-Binding wire3.3051360198.3078
10MR6007-Hier Charges for Centering6.1876784194.786
11MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)4.145297903274.7791
Total Material 56400