State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: BANS
Work Code: 1713004028/WC/9993658586 (Ts No. 862 कपिलधारा कूप निर्माण महेन्‍द्र कुमार पटेल/वंशपती पटेल )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2015 Work start date : 20/10/2015
Present status : Non-existent Proposed Status : Underground Dyke
Tech Sanction Details
Technical Sanction No. : 862/28 Sanction Date : 4/10/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
154000 218000 0 0 0 0 0 218000 0 372000
Financial Sanction Details
Financial\Administrative Sanction No: 14/28 Financial\Administrative Sanction Date 10/10/2015
Fin. Sanc. Amt. (in Rs) NREGA:372000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
372000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard000
2Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like.60583480
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)1.8153922.17118.6115
4False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift2.701275.4743.8554
5Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)76.7682648.7203335.4016
6Extra rate for C.R./ R.R./ U.C.R. stone masonry in super structure above plinth level upto floor two level.60.151181.710929.4367
7TRANSPORTATION OF MATERIAL16500065000
8Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing163.0289.614606.592
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)7.257867.16292.5447
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)7.257867.16292.5447
11Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m11.025182.62013.165
12Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 10.5 m initial depth upto 15.0 m11.025250.12757.3525
13Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m9.8136095976.117
14Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 10.5 m initial depth upto 18.0 m7.257867.16292.5447
15Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)7.257173.421258.50894
16Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.33.07687.32887.5348
17Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work11.025102.71132.2675
18Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work9.8136095976.117
19Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work11.025181.62002.14
20Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work11.025250.12757.3525
21contingency11100411004
22Labour difference in case of old SoR601579420
Total Activity 372000
S.NoMaterialQuantityUnit PriceTotal
120 mm Metal1.54312501928.75
2Cement16327044010
3Contangancy190009000
4Display board115001500
5Masonry Stone12.283251030830.33
6Rubble Stone64.485105067709.25
7sand33.398175058446.5
8Transporation of Masonry Stone110001000
9Transporation of Sand110001000
10Transpotation Charges120002000
Total Material 218000