S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 22.78 | 3307.4 | 75342.572 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 30.38 | 2202.3 | 66905.874 |
3 | Labour only for item no. 0413 (for any proportion of cement concrete) | 30.38 | 458 | 13914.04 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 67.5 | 147.8 | 9976.5 |
5 | Labour only for item no. 0430 | 67.5 | 62.5 | 4218.75 |
6 | Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand) | 101.25 | 2082.1 | 210812.625 |
7 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 270 | 127.6 | 34452 |
8 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 27.945 | 422.7 | 11812.3515 |
9 | Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite. | 101.25 | 577.2 | 58441.5 |
10 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 45 | 96.2 | 4329 |
11 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 1 | 5817 | 5817 |