S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 0 | 0 | 0 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 0 | 0 | 0 |
3 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 325.07 | 90 | 29256.3 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 2208.4 | 45 | 99378 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 2229.9 | 45.5 | 101460.45 |
6 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:3 (1cement, 3sand) | 127.8 | 90 | 11502 |
7 | Transportation of metal | 285.1 | 16.94 | 4829.594 |
8 | Transportation of metal | 127.08 | 40.71 | 5173.4268 |
9 | Transportation of metal | 812.1 | 41.04 | 33328.584 |
10 | Transportation of metal | 812.1 | 40.3 | 32727.63 |
11 | Transportation of metal | 5 | 11240 | 56200 |
12 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1.8 | 450 | 810 |
13 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil. | 14 | 450 | 6300 |