State: MADHYA PRADESH District: SATNA Block: UNCHAHARA Panchayat: PIPAROKHAR
Work Code: 1712004017/RS/22012034690608 (VYAKTIGAT SOAKPIT NIRMAN KARYA 10 NAG GRAM PIPROKHAR)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 27/1/2023 Work start date : 25/2/2023
Present status : Not Exist Proposed Status : Construction of Soak Pit for Community
Tech Sanction Details
Technical Sanction No. : 1712004/2022-2023/20835/TS Sanction Date : 28/2/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
29344.5 75807.01 1776.16 3206.71 0 0 0 80800 0 110134.38
Financial Sanction Details
Financial\Administrative Sanction No: 1712004/2022-2023/20835/AS Financial\Administrative Sanction Date 2/3/2023
Fin. Sanc. Amt. (in Rs) NREGA:110134 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
111000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(a) C.C. 1:2:4 (1cement, 2sand, 4metal)0.484196.43752014.29
2(d) C.C. 1:5:10 (1 cement, 5sand, 10metal)1.2662744.115323854663474.05
3(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)1.1255631.982222222226335.98
4(c) 50 mm thick4.8349.7416666666671678.76
5(j) Cement mortar 1:6 (1cement, 6sand)2.084636.259643.4
6(b) In cement mortar 1:411.04630.7219202898556963.17
7(a) Mild steel and Medium tensile steel bars22.07884.23589093214971859.76
8(d) Cement mortar 1:6 (1cement, 6sand)30.34109.4172709294663319.72
940mm cement concrete flooring with 25mm under layer of cement concrete 1:3:6 (1cement, 3sand, 6stone aggregate of size 12.5mm and below) and 15mm wearing (1cement, 2 to 3 stone aggregate of size 4.75mm and below) laid in interval with base course and finished with a floating coat of neat cement.13.225352.9928166351614668.33
10Collection of hard metal other then black trap basalt and granite for building work (without blasting) . (a) 40 mm nominal size21.937569.38460135843512490.59
11(XX) 20 Km. Lead33.18363.21760096443612051.56
12(d) 600 mm dia.92535.2088888888922816.88
13(a) 110 mm diameter OD RM 210.6050226.60611330.3
14(b) Dense or hard soil42.9156.7874125874136726.18
15Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.11.25172.8897777777781945.01
16Providing and fixing in position HDPE Film 500 micron, black colour ,420 GSM for jalkundi,farm pond & any water storage structure i/c cost of all material, labour laying , jointing as per specification.22.5120.7293333333332716.41
Total Activity 111000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.3418271000341.827
20084-Hire charges of Diesel truck - 9 tonne (without POL)2.0960071821004401.615078
30295-Stone Aggregate(single size):20 mm nominal size0.23805750178.5375
40297-Stone Aggregate(single size): 10 mm nominal size0.37965650246.7725
50367-Portland Cement1.23109564007879.008
60763-Glue 0.91917.1
70982-Coarse sand (zone III)0.78972979.2773.293824
80983-Fine sand (zone IV)1.893407810251940.742995
91004-Average rate of mild steel round bars for reinforcements0.30909964001978.2336
101174-Red sand stone slab 45 mm to 50 mm thick (un-dressed)5.28170897.6
111235-Diesel oil43.454388941004345.438894
122903-Stone chippings/ screenings 4.75 mm nominla size0.19837549097.20375
133-Display Board / CIB1100100
145001-Mobil oil1.54895948270418.2190596
157335-Binding wire0.220786013.2468
167900-Modular common burnt clay bricks of class designation 7.51688.85.28781.76
17MR11640-uPVC Pipe (Working Pressure 4kg/cm square) single socketed pipe 110mm dia501608000
18MR11641-uPVC Pipe (Working Pressure 4kg/cm square) rubber (seal) ring 100mm dia8.3333333325208.33333325
19MR11736-HDPE Polythene sheet 500 micron thick, 420 GSM Black Colour24.75862128.5
20MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT1.0725500536.25
21MR6007-Hier Charges for Centering1.125678762.75
22MR6041-RCC NP-3 pipe 600mm(based on LUN rate)9194317487
23MR6042-RCC NP-3 collar 600mm(based on LUN rate)2.7270729
24MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)1.16319790918.9201
Total Material 63200