S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 400 | 0.3 | 120 |
2 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 22.5 | 882 | 19845 |
3 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used | 15.75 | 3307.4 | 52091.55 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 60 | 147.8 | 8868 |
5 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 210 | 1079 | 226590 |
6 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 125 | 59.1 | 7387.5 |
7 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 640 | 78.5 | 50240 |
8 | Transportation of metal | 16.88 | 136.7 | 2307.496 |
9 | Transportation of metal | 13.39 | 355.7 | 4762.823 |
10 | Transportation of sand | 8.44 | 259.83 | 2192.9652 |
11 | Transportation rates for Masonry stone. | 210 | 211.25 | 44362.5 |
12 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 93.83 | 123.03 | 11543.9049 |
13 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 4.02 | 112.32 | 451.5264 |
14 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 90 | 52.7 | 4743 |
15 | contingency | 1 | 12993.7345 | 12993.7345 |