S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 212.5 | 6.65 | 1413.125 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 63.75 | 200.95 | 12810.5625 |
3 | White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement. | 212 | 776.18 | 164550.16 |
4 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 2 (Size ranging from 63 mm to 45 mm) | 63.75 | 392.56 | 25025.7 |
5 | Transportation of metal | 63.75 | 234.04 | 14920.05 |