State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: GADHOLAKHANDE
Work Code: 1711003048/IF/1000061328 (kapildhara koop nirman sadarsingh/phoolsingh Lodhi)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 2/10/2013 Work start date : 20/12/2013
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1160 Sanction Date : 15/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
159821 175740 0 0 0 0 0 176000 0 335561
Financial Sanction Details
Financial\Administrative Sanction No: 10/ss Financial\Administrative Sanction Date 16/12/2013
Fin. Sanc. Amt. (in Rs) NREGA:335561 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
336000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency197739773
3Work charge12211222112
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead188.221.94121.58
5Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m239.235.88563.36
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)22.954165.1895590.881
7False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift334.41223.874840.958
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars418.954.422788.16
9TRANSPORTATION OF MATERIAL11596215962
10Earth work for well excavation-Lift from 7.50 m. to 8.00 m.000
11Earth work for well excavationSoil Lift from 1.5 m. to 2.00 m.19.23126.82438.364
12Earth work for well excavation-Soil lift from 2.00 m. to 2.50 m.19.23133.92574.897
13Earth work for well excavation-soil lift from 2.50 m. to 3.00 m.19.231412711.43
14Earth work for well excavation-Soil lift from 3.00 m. to 3.50 m.16.58148.12455.498
15Earth work for well excavation-Soil lift from 5.50 m. to 6.00 m.15.33183.62814.588
16Earth work for well excavation-Soil lift from 3.50 m. to 4.00 m.16.58155.22573.216
17Earth work for well excavation-Soil lift from 4.00 m. to 4.50 m.16.58162.32690.934
18Earth work for well excavation-Soil lift from 4.50 m. to 5.00 m.16.58169.42808.652
19Earth work for well excavation-Soil lift from 5.00 m. to 5.50 m.15.33176.52705.745
20Earth work for well excavation-Soil lift from 6.00 m. to 6.50 m.15.331932958.69
21Earth work for well excavation-Soil lift from 6.50 m. to 7.00 m.15.33202.43102.792
22Earth work for well excavation-Soil lift from 7.00 m. to 7.50 m.14.13211.82992.734
23Earth work for well excavation-soil lift from 7.50 m. to 8.00 m.11.87230.62737.222
24Earth work for well excavation-Soil lift from 8.00 m. to 8.50 m.11.872402848.8
25Earth work for well excavation-Soil lift from 10.50 m. to 11.00 m.9.812802746.8
26Earth work for well excavation-Soil lift from 8.50 m. to 9.00 m.11.87249.42960.378
27Earth work for well excavation-Soil lift from 9.00 m. to 9.50 m.11.87249.42960.378
28Earth work for well excavation-Soil lift from 9.50 m. to 10.00 m.11.87258.83071.956
29Earth work for well excavation-soil lift from 10.00 m. to 10.50 m.9.81268.22631.042
30Earth work for well excavation-Soil lift from 11.00 m. to 11.50 m.8.85291.82582.43
31Earth work for well excavation-Soil lift from 11.50 m. to 12.00 m.8.85303.62686.86
32Earth work for well excavation-Soil lift from 12.00 m. to 12.50 m.7.94315.42504.276
33Earth work for well excavation-Soil lift from 12.50 m. to 13.00 m.7.94327.22597.968
34Earth work for well excavation-Soil lift from 13.00 m. to 13.50 m.7.943392691.66
35Earth work for well excavation-Soil lift from 13.50 m. to 14.00 m.7.94350.82785.352
36Earth work for well excavation-soil lift from 14.00 m. to 14.50 m.6.28362.62277.128
37Earth work for well excavation-Soil lift from 14.50 m. to 15.00 m.6.28374.42351.232
38Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work57.59119.76893.523
Total Activity 336000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.19.5130725486.5
240 M.M. METAL000
3boldar000
4Cement(bori)14528040600
5Contagecny150005000
6dewatering810008000
7false (work) (sentring)334.41123.341232.753
8IRON SARIYA418.949.820861.22
9P V C PIPE 21161161
10PhotoCopy & Stationary122002200
11Sand9.87109110768.17
12sand (t)5.42581393.2
13Transpotation Charges11796217962
14साईनबोर्ड 120002000
Total Material 176000