S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 4500 | 1.5 | 6750 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 7000 | 3.7 | 25900 |
3 | Lime Surkhi Mortar 1:1:1 ( 1 lime putty, 1 surkhi, 1sand ) | 586.85 | 36.3 | 21302.655 |
4 | Contingency | 1 | 70000 | 70000 |
5 | Work charge | 1 | 12000 | 12000 |
6 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 22.79 | 99.6 | 2269.884 |
7 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 797.23 | 23.6 | 18814.628 |
8 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 31.28 | 3231.5 | 101081.32 |
9 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 6.53 | 2451.8 | 16010.254 |
10 | False work for R.C.C. and P.C.C. work in plinth and foundation | 10.26 | 132.3 | 1357.398 |
11 | Chain and compass survey.-Headworks/Other Works | 0.7 | 792 | 554.4 |
12 | Chain and compass survey.-Canals/Roads | 1 | 628 | 628 |
13 | Fly levelling for fixing temporary bench marks.-Upto 15 m interval | 0.7 | 792 | 554.4 |
14 | Levelling - Headwork.-Below 5 m interval | 0.7 | 1570 | 1099 |
15 | Levelling - Headwork.-5 to 10 m interval | 0.7 | 1570 | 1099 |
16 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1740 | 164.25 | 285795 |
17 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 4983.69 | 44.1 | 219780.729 |
18 | Providing laying and compacting of 40mm thick metal renual coat in wet season including picking old road surface, spreading of clean and crushed aggregate grading - 3, screenings and korebandi and rolling with power roller exceeding 8 tonne as per MOST 20 | 326.03 | 544.9 | 177653.747 |
19 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia. | 7.5 | 3125.6 | 23442 |
20 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1594.4 | 21.6 | 34439.04 |
21 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to Table 2.2 of IRC:SP:77-2008, having Liquid Limit less than 25 and Plasticity inde | 270 | 729.28 | 196905.6 |
22 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP: | 108.68 | 381.9 | 41504.892 |
23 | Collection of soft moorum including stacking at quarry. | 740 | 121.3 | 89762 |