State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: MANGLIYA
Work Code: 1719006010/LD/22012034227567 (Shantidham dhard ke pass mangliya)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2015 Work start date : 16/7/2015
Present status : NEW Proposed Status : Crematorium
Tech Sanction Details
Technical Sanction No. : 10/01/2015 Sanction Date : 10/7/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
390700 98600 0 0 0 0 0 98600 0 489300
Financial Sanction Details
Financial\Administrative Sanction No: 10/01/2015 Financial\Administrative Sanction Date 15/7/2015
Fin. Sanc. Amt. (in Rs) NREGA:489300 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
490000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 100 cm and not exceeding 150 cm000
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)0.81853.31482.64
3Labour only for item no. 0413 (for any proportion of cement concrete)0.8418.3334.64
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)3.813154.512018.645
5Labour only for item 0425.3.81578.72204.847
6False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift22.565111.12506.9715
7Labour only for item no. 0428.22.56592.52087.2625
8Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:5 (1cement, 5sand)5.042238.311281.032
9Labour only for brick masonry in plinth and foundation I/c making mortar for item no.06055.04656.93310.776
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars300.0750.715213.549
11Labour only for item no.0904300.074.81440.336
12Transportation of metal 590.5940.6824025.2012
13Loading of metal in truck, dumper etc.590.5928.2616690.0734
14Unloading of metal in truck, dumper etc.590.5914.138345.0367
15Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.590.5944.126045.019
16Loosening, Levelling and Compacting original ground, supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, spreading in 4% camber and required gradient with tractor mounted grader or labourers, waterin590.5930.2517865.3475
17Site clearance, cutting grass, raking into heaps and removing off the premises14001.82520
18Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil2500.895237576
19Collection of soft moorum including stacking at quarry.590.5911064964.9
20Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.1826.6513.825207.77
21contingency11425314253
Total Activity 490000
S.NoMaterialQuantityUnit PriceTotal
140 M.M. Metal0.72700504
2Bricks25203.58820
3Cement3928010920
4Contengency11385913859
5False work22.56111.12506.416
6Metal 20 mm3.129002808
7Rolling of Muram590.530.2517862.625
8SAND2.977002079
9steel300.07150.715213.5997
10Transpotation Charges590.5940.6824025.2012
Total Material 98600