S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (ii) 1.5meter vertical lift and 30meter horizontal lead | 1890 | 184.008984126984 | 347776.98 |
2 | Cleaning of silt/sand from drinking water tank/canal/ponds. (b) 1.5 meter vertical lift and 30 meter horizontal lead. | 1260 | 114.748873015873 | 144583.58 |
3 | Cleaning of jalkhumbi ( Pistia Stratiotes). (10.3) upto 30cm size cleaning of without marsh/mud (pond | 3780 | 12.0373121693122 | 45501.04 |