State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: KAITHORA
Work Code: 1711003043/IF/9993711382 (KAPIL DHARA KOOP NIRMAN RAJKUMARI / DINESH PRASAD LODHI)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 15/8/2015 Work start date : 30/1/2016
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 493/ket Sanction Date : 28/1/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
193000 197000 0 0 0 0 0 197000 0 390000
Financial Sanction Details
Financial\Administrative Sanction No: 112/ket Financial\Administrative Sanction Date 29/1/2016
Fin. Sanc. Amt. (in Rs) NREGA:390000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
390000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency11186211862
3Work charge11070910709
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead238.2223.95693.458
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)20.473698.3975706.0433
6False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift437.09250.5109491.045
7Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height791.4356.244478.366
8TRANSPORTATION OF MATERIAL12246922469
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil23.8498.12338.704
10Earth work for well excavation-Hard moorum lift from 1.5 m. to 2.00 m.7.94105.9840.846
11Earth work for well excavation-Hard moorum lift from 2.00 m. to 2.50 m.7.94143.11136.214
12Earth work for well excavation-Hard moorum lift from 2.50 m. to 3.00 m.7.94150.91198.146
13Earth work for well excavation-Hard moorum lift from 3.00 m. to 3.50 m.7.94158.71260.078
14Earth work for well excavation-Hard moorum lift from 3.50 m. to 4.00 m.7.94166.51322.01
15Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m.7.94174.31383.942
16Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m.7.94182.11445.874
17Earth work for well excavation-Hard moorum lift from 5.00 m. to 5.50 m.7.94189.91507.806
18Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 5.50 m. to 6.00 m.7.94467.43711.156
19Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.00 m. to 6.50 m.7.94484.323845.5008
20Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.50 m. to 7.00 m.7.94501.243979.8456
21Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.00 m. to 7.50 m.7.94518.164114.1904
22Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.50m. to 8.00 m.7.94535.084248.5352
23Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.00 m. to 8.50 m.7.945524382.88
24Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.50 m. to 11.00 m.7.94641.285091.7632
25Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.50 m. to 9.00 m.7.94568.924517.2248
26Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 9.00 m. to 9.50 m.7.94585.844651.5696
27Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 9.50 m. to 10.00 m.7.94602.764785.9144
28Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.00 m. to 10.50 m.7.94619.684920.2592
29Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.00 m. to 11.50 m.7.94662.885263.2672
30Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.50 m. to 12.00 m.7.94684.485434.7712
31Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.00 m. to 12.50 m.7.94706.085606.2752
32Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m.7.94727.685777.7792
33Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.00 m. to 13.50 m7.94749.285949.2832
34Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.50 m. to 14.00 m.7.94770.886120.7872
35Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.00 m. to 14.50 m.7.94792.486292.2912
36Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.50 m. to 15.00 m.7.94814.086463.7952
Total Activity 390000
S.NoMaterialQuantityUnit PriceTotal
140 M.M. METAL8.12582089.8
2boldar10.82883110.4
3Cement(bori)16230048600
4Centering and Shuttering294.41100.329529.323
5CONTANGANCY135023502
6dewatering810008000
7IRON SARIYA791.4356.244478.366
8P V C PIPE 21274274
9PhotoCopy & Stationary115001500
10Sand23.72100023720
11Transpotation Charges195209520
12गिटटी 20 एम एम17.23120020676
13साईनबोर्ड 120002000
Total Material 197000