State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: PACHOR
Work Code: 1719006081/RC/22012034175331 (panch parmeswar cc roadbansilal to bhera )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2013 Work start date : 17/7/2013
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 81/2 Sanction Date : 15/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
92850 59750 0 0 300000 0 0 360000 0 452600
Financial Sanction Details
Financial\Administrative Sanction No: 81/2 Financial\Administrative Sanction Date 17/7/2013
Fin. Sanc. Amt. (in Rs) NREGA:152260 Panchparmeshwar
300000
Scheme 2
0
Scheme 3
0
Total
453000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)118.872574.9306078.363
2Labour only for item no. 0413 (for any proportion of cement concrete)118.87392.246620.814
3False work for R.C.C. and P.C.C. work in plinth and foundation105.5153.116152.05
4Deduct for concrete unvibrated in item no. 0425105.515616458
5Transportation of metal 115.3550.675844.7845
6Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.104.61166.417407.104
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.53.49149.768010.6624
8Loading of metal in truck, dumper etc.115.3526.283031.398
9Unloading of metal in truck, dumper etc.115.3513.141515.699
10Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7115.35414729.35
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work125.281.210166.24
12Collection of soft moorum including stacking at quarry.115.35112.813011.48
13work charge117501750
14contingency118001800
Total Activity 453000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL104.6190094149
2CEMENT(BEGS)613280171640
3contangency and work charges119501950
4FALSE WORK105.595.710096.35
5mason perday182003600
6sand cum53.4970037443
7Transportanion of hard Muram115.3555.86436.53
8Transportanion of sand53.49149.768010.6624
9transpotation of matel104.61166.417407.104
10Vibrator (Per Day)185009000
Total Material 360000