State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: MANGOLA
Work Code: 1711003017/RC/22012034200904 (Construction of Gravel Road)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2013 Work start date : 18/1/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1279/Mangola Sanction Date : 15/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
735000 481000 0 0 0 0 0 481000 0 1216000
Financial Sanction Details
Financial\Administrative Sanction No: 21/Mangola Financial\Administrative Sanction Date 16/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:1216000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1216000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.47254.119372.5
3Contingency1138695138695
4Work charge13683036830
5TRANSPORTATION OF MATERIAL1411105411105
6Chain and compass survey.-Canals/Roads1584584
7Fly levelling for fixing temporary bench marks.-Above 15 m interval1438438
8Levelling - Headwork.-Below 5 m interval114601460
9Levelling - Headwork.-Above 15 m interval1467.2467.2
10Stacking without boxing.-Puddle earth, moorum, sand or kankar42010.54410
11Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.20914185731
12Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia40311.712468
13Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making2887.622.665259.76
14Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor2029.92448717.6
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work1860.281.2151048.24
16Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil33341002
17Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil36872061
18Collection of soft moorum including stacking at quarry.2090.9112.8235853.52
Total Activity 1216000
S.NoMaterialQuantityUnit PriceTotal
1BGSY Information Board in Ceme159335933
2Cement4025010000
3Compaction of Earth Work2887.622.665259.76
4Compaction of GSB2090.92450181.6
5contangency and work charges130003000
6First Aid Box1500500
7Kilometre Stone (200 M)33341002
8Kilometre Stone (ordinary)26871374
9PhotoCopy & Stationary120002000
10roller42061.525830
11setting out wotrk152245224
12steel purches(8mm 10mm 12mm)9054.44896
13Transportation of GSB209199207009
14Transportation Of Selected Soi595.79138.4282469.2518
15Transpotation Charges000
16watering11000010000
17गिटी 20 mm7.26004320
18रेत54002000
Total Material 481000