Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:23:46 AM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: DANGICHA
Work Code: 1719006032/IF/9993667777 (Nanadan Falodyan Mangilal-Karansingh GP Dangicha)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 22/6/2015 Work start date : 24/6/2015
Present status : Not Exist Proposed Status : Plantation
Tech Sanction Details
Technical Sanction No. : 32/02/15 Sanction Date : 23/6/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
62200 30900 0 0 0 0 0 30900 0 93100
Financial Sanction Details
Financial\Administrative Sanction No: 32/02/2015 Financial\Administrative Sanction Date 24/6/2015
Fin. Sanc. Amt. (in Rs) NREGA:93100 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
93100
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.000
2Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil280257000
3contingency127122712
4Grass cutting and made of bundel 8"-10" dia with storage Mandays per hundred bundels000
5Applying chemicles in soil around plants Mandays per hundred.8406050400
6Layout of Field for per digging of pits for plantation work.80000.54000
7Preperation of pits for plantation of poly plants including mixing of soil manure fertilizer and insecticides with first watering etc. complete.8401512600
8Supply of vermi compost2807.52100
9Supply of singal super phosphate (SSP)706.08425.6
10Supply of muriate of potash (MOP)3516.98594.3
11Supply of urea.356210
12Supply of Themate, phorate 10 G pesticites765455
13Supply of foresty or horticulture Plant cost 3 to5 feet . height4203012600
Total Activity 93100
S.NoMaterialQuantityUnit PriceTotal
1contigency151105110
2Convergence Amount000
3Fertilizer3522.98804.3
4Lime Powder50201000
5Manure2807.52100
6Pesticides280154200
7Plant4203012600
8Single Super Phosphate706.08425.6
9Themete Forate765455
10Transpotation Charges420104200
Total Material 30900