State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: BAROKHAR
Work Code: 1713004020/RC/22012034211204 (Ts no 2029 खेत सडक छोटेलाल सेन के घर से राजप्रताप )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2013 Work start date : 4/3/2014
Present status : Earthern road Proposed Status : Bitumen Top
Tech Sanction Details
Technical Sanction No. : 2029/20 Sanction Date : 22/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost MMGSY scheme2 scheme3 Total
712000 480000 0 0 0 0 0 480000 0 1192000
Financial Sanction Details
Financial\Administrative Sanction No: 26/020 Financial\Administrative Sanction Date 25/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1192000 MMGSY
0
Scheme 2
0
Scheme 3
0
Total
1192000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises64001.610240
2Dag-beling-Single spade stroke minimum 75mm deep30000.2600
3Transportation of metal 2747.525102.69282143.34225
4Transportation of metal 581.95223.56130100.742
5Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia20964.419288
6Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1838.5521.539528.825
7Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1709.82339325.4
8Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)581.9539.623045.22
9Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:154.5578.389347.35
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work919.27581.274645.13
11Collection of puddle earth including stacking at quarry2747.525112.8309920.82
12Collection of hard moorum including stacking at quarry.463.5130.860625.8
13Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)614698814
14SIGN BOARD120002000
15contingency12932629326
16Labour difference in case of old SoR50014673000
Total Activity 1192000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work1838.5516.830887.64
2Compaction of GSB118.45391.4846370.806
3Compaction of Selected soil1709.819.833854.04
4contangency and work charges12932629326
5Display board11191511915
6HumePipes12250022500
7soil transportation2747.5363.27173836.2231
8Tran. water lead339910.535689.5
9Transportation charges11000010000
10transportation of hard muram 1463.5184.1485348.89
Total Material 480000