Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:04:47 AM 
Back  
State: MADHYA PRADESH District: REWA Block: NAIGARHI Panchayat: KORIGAWAN
Work Code: 1713007062/PG/9425891264 (खेल मैदान प्रा० शाला कोरिगंवा TS 873)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/1/1900 Work start date : 1/1/1900
Present status : NEW Proposed Status : Construction of Play field for Community
Tech Sanction Details
Technical Sanction No. : 62/873 Sanction Date : 7/12/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
145000 92000 0 0 0 0 0 92000 0 237000
Financial Sanction Details
Financial\Administrative Sanction No: 062/01 Financial\Administrative Sanction Date 7/12/2016
Fin. Sanc. Amt. (in Rs) NREGA:237000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
237000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.12004.14920
2Dag-beling-Single spade stroke minimum 75mm deep1200.224
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead33565.722009.5
4Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)12.962179.328243.728
515mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand)56.698.55575.1
6Transportation of metal 84.6102.68679.96
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.28.963368.410669.9692
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work57081.246284
9SIGN BOARD135003500
101911 UNLOADING MATERIAL200050100000
11work charge17093.747093.74
Total Activity 237000
S.NoMaterialQuantityUnit PriceTotal
1cement bag132623262
2Roller135613561
3Sand167806780
4TRAINSPORT CHARGE17485674856
5Transportation of Water135413541
Total Material 92000