S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1200 | 4.1 | 4920 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 120 | 0.2 | 24 |
3 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 335 | 65.7 | 22009.5 |
4 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 12.96 | 2179.3 | 28243.728 |
5 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand) | 56.6 | 98.5 | 5575.1 |
6 | Transportation of metal | 84.6 | 102.6 | 8679.96 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 28.963 | 368.4 | 10669.9692 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 570 | 81.2 | 46284 |
9 | SIGN BOARD | 1 | 3500 | 3500 |
10 | 1911 UNLOADING MATERIAL | 2000 | 50 | 100000 |
11 | work charge | 1 | 7093.74 | 7093.74 |