State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: PATNAMANGARH
Work Code: 1711006002/WC/2165 (नवीन तालाब र्नि‍माण कार्य/ महुआ के पेड के पास/ पटन)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/12/2011 Work start date : 25/12/2011
Present status : Non-existent Proposed Status : Earthen Bunding
Tech Sanction Details
Technical Sanction No. : 188/904 Sanction Date : 27/12/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
380000 120000 0 0 0 0 0 120000 0 500000
Financial Sanction Details
Financial\Administrative Sanction No: 02/02 Financial\Administrative Sanction Date 28/12/2011
Fin. Sanc. Amt. (in Rs) NREGA:500000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Site clearance, cutting grass, raking into heaps and removing off the premises21001.63360
3Contingency11300013000
4Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil170.188.815104.88
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)4.152404.19977.015
6Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)17200534085
7Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing30133.33999
822cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.357.2136.148614.92
9Transportation of metal 85176.77715026.045
10Transportation of sand96138.4213288.32
11Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.170.1138.3223528.232
12Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.95.5413915.5
13FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.170.1262.544651.25
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work350073.4256900
15Collection of hard moorum including stacking at quarry.95.5130.812491.4
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
120 MM METAL26501300
240 mm size HG metal4.153501452.5
3Cement6028016800
4Display board120002000
5PhotoCopy & Stationary5100500
6Photograph2025500
7RR stone (Granite)3044013200
8Sand56503250
9Transpotation Charges18000080000
Total Material 120000