State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: BAROKHAR
Work Code: 1713004020/DP/22012034433712 (पेयजल कूप निर्माण उमरिहा टोला विदेसी कुम्हार के घर के पास टी यस 146692/05)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2018 Work start date : 1/10/2018
Present status : Not Exist Proposed Status : Construction of Irrigation Open Well for Community
Tech Sanction Details
Technical Sanction No. : 146692/05 Sanction Date : 16/8/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
307000 228000 0 0 0 0 0 228000 0 535000
Financial Sanction Details
Financial\Administrative Sanction No: 09/20/2018 Financial\Administrative Sanction Date 20/8/2018
Fin. Sanc. Amt. (in Rs) NREGA:535000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
535000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva151492235
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m76.75745679.5
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)43235.412941.6
5Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used7.033235.422744.862
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)35.214253149748.13
7Brick bat filling in trenches or soak pits.6.75325.62197.8
8Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height4.5400018000
9Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars691.252.336149.76
10Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.40.32164566326.4
11Earth work for well excavation-Lift from 1.5 m. to 2.00 m.75.3618614016.96
12Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)25.1252313137.76
13Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m.786.1527458175.248
14Earth work for well excavation-Hard rock requiring blasting lift from 3.00 m. to 3.50m.82.08588.748320.496
15Earth work for well excavation-Hard rock requiring blasting lift from 5.50 m. to 6.00 m.35.23676.323826.049
16Earth work for well excavation- Hard rock requiring blasting lift from 4.00 m. to 4.50 m.32.8676.622192.48
17Earth work for well excavation-Hard rock requiring blasting lift from 4.50 m. to 5.00 m.32.8682.522386
18Earth work for well excavation-Hard rock requiring blasting lift from 5.00 m. to 5.50 m.21.23674.414317.512
Total Activity 535000
S.NoMaterialQuantityUnit PriceTotal
1100 mm pipe110001000
220 M.M. METAL35.27155054668.5
3Binding wire100.5868643
4Blasting510005000
5Bricks50005.527500
6cement Begs21028058800
7Centering and Shuttering2318018480
8Display board115001500
9SAND18.8125023500
10sariya45058.526325
11Transporation of Boulder120002000
Total Material 228000