Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:22:06 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SYAU(P)
Work Code: 1703004084/RC/22012034182585 (खरंजा निर्माण गंगाराम के द्वार से सरमन के घर की ओर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 13/9/2013
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 84/711 Sanction Date : 19/8/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
124904 60961 0 0 0 0 0 61000 0 185865
Financial Sanction Details
Financial\Administrative Sanction No: 84/03 Financial\Administrative Sanction Date 30/8/2013
Fin. Sanc. Amt. (in Rs) NREGA:185865 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
186000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency11339513395
2Dag-beling-Single spade stroke minimum 75mm deep2000.240
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.360215.777652
4Stacking without boxing.-Puddle earth, moorum, sand or kankar211.510.52220.75
5Transportation rates for Masonry stone.54385.8520835.9
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.211.5143.130265.65
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.211.5418671.5
8Collection of hard moorum including stacking at quarry.211.5130.827664.2
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.40012.85120
Total Activity 186000
S.NoMaterialQuantityUnit PriceTotal
1contangency14895.454895.45
2PhotoCopy & Stationary110001000
3sign board140004000
4खण्‍डा परिवहन54385.8520835.9
5मुरम परिवहन (1)211.5143.130265.65
Total Material 61000