Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:27:48 AM 
Back  
State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: PATNAMANGARH
Work Code: 1711006002/WC/9993633322 (तालाब जल क्षमता ब़द्वि कार्य उमरया तालाब ग्राम पटन)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2013 Work start date : 1/4/2013
Present status : Existing Proposed Status : Earthen Bunding
Tech Sanction Details
Technical Sanction No. : 39/02 Sanction Date : 14/5/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
421000 81000 0 0 0 0 0 81000 0 502000
Financial Sanction Details
Financial\Administrative Sanction No: 39/02 Financial\Administrative Sanction Date 16/5/2013
Fin. Sanc. Amt. (in Rs) NREGA:502000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
502000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)03089.90
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)02404.10
4Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used0169.40
5Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)020050
6Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing0133.30
7Labour only for item no.1272350118.641510
8Collection of puddle earth including stacking at quarry170.190.215343.02
9Transportation of sand0215.320
10Transportation rates for Masonry stone.0215.320
11Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.80176.8714149.6
12Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.100414100
13FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc.170.1151.925838.19
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work350081.2284200
15Collection of hard moorum including stacking at quarry.100130.813080
16Collection of quarried stone or rubble.84.7181.115339.17
1722cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014370233.686432
18Earth work in ordinary soil all lead and lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer in charge.01460
Total Activity 502000
S.NoMaterialQuantityUnit PriceTotal
1contangency154005400
2Display board120002000
3PhotoCopy & Stationary1500500
4Photographs1500500
5Stone other than Granite6567043550
6Transportation charges of mate12900029000
Total Material 81000