S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 380 | 7.60931578947368 | 2891.54 |
2 | Providing stone chips under stone pitching | 64 | 612.63625 | 39208.72 |
3 | (a) Other then black trap Basalt or granite | 113.4 | 367.086155202822 | 41627.57 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 1013.4 | 2.73487270574304 | 2771.52 |
5 | (III) 1.5 Km. Lead | 428.4 | 110.846241830065 | 47486.53 |
6 | (VIII) 4.0 Km. Lead | 585 | 152.598598290598 | 89270.18 |
7 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 113.4 | 490.630599647266 | 55637.51 |
8 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 1013.4 | 23.148963883955 | 23459.16 |
9 | b (iii) Dense or hard soil for Tank Work | 338.625 | 156.081240310078 | 52853.01 |
10 | c (iii) Hard moorum for Tank Work | 606.6 | 207.900214309265 | 126112.27 |
11 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 26.475 | 659.77790368272 | 17467.62 |