State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: KAITHORA
Work Code: 1711003043/IF/9926699412 (कपिलधारा कूप ग्‍यान बाई / नन्‍नेभाई सींग सौंर)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 26/1/2013 Work start date : 7/2/2014
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 732/732 Sanction Date : 11/2/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
230000 147000 0 0 0 0 0 147000 0 377000
Financial Sanction Details
Financial\Administrative Sanction No: 09/09 Financial\Administrative Sanction Date 12/2/2013
Fin. Sanc. Amt. (in Rs) NREGA:377000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
377000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency11694116941
3Work charge810008000
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead376.7420.17572.474
5Labour only for item no.0402200.4532.96594.805
6Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used0.562923.91637.384
7Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm1311227.1160750.1
8Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)4.481984.78891.456
9TRANSPORTATION OF MATERIAL12481224812
10Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing25.6271.21824.144
11Earth work for well excavation-Lift from 11.50 m. to 12.00 m.13.45427.25745.84
12Earth work for well excavation-Lift from 1.5 m. to 2.00 m.26.03114.22972.626
13Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil86.7882.87185.384
14Earth work for well excavation-Soil lift from 2.00 m. to 2.50 m.24.96120.83015.168
15Earth work for well excavation-soil lift from 2.50 m. to 3.00 m.23.69127.43018.106
16Earth work for well excavation-Soil lift from 3.00 m. to 3.50 m.22.941343073.96
17Earth work for well excavation-Soil lift from 5.50 m. to 6.00 m.19.341673229.78
18Earth work for well excavation-Soil lift from 3.50 m. to 4.00 m.22.19140.63119.914
19Earth work for well excavation-Soil lift from 4.00 m. to 4.50 m.21.46147.23158.912
20Earth work for well excavation-Soil lift from 4.50 m. to 5.00 m.20.74153.83189.812
21Earth work for well excavation-Soil lift from 5.00 m. to 5.50 m.20.03160.43212.812
22Earth work for well excavation-Soil lift from 6.00 m. to 6.50 m.18.65175.73276.805
23Earth work for well excavation-Soil lift from 6.50 m. to 7.00 m.17.98184.43315.512
24Earth work for well excavation-Soil lift from 7.00 m. to 7.50 m.17.33193.13346.423
25Earth work for well excavation-soil lift from 7.50 m. to 8.00 m.16.68201.83366.024
26Earth work for well excavation-Soil lift from 8.00 m. to 8.50 m.16.05210.53378.525
27Earth work for well excavation-Soil lift from 10.50 m. to 11.00 m.14.03443.86226.514
28Earth work for well excavation-Soil lift from 8.50 m. to 9.00 m.15.43219.23382.256
29Earth work for well excavation-Soil lift from 9.00 m. to 9.50 m.14.96404.86055.808
30Earth work for well excavation-Soil lift from 9.50 m. to 10.00 m.14.62416.76092.154
31Earth work for well excavation-soil lift from 10.00 m. to 10.50 m.14.31428.66133.266
32Earth work for well excavation-Soil lift from 11.00 m. to 11.50 m.13.754596311.25
33Earth work for well excavation-Soil lift from 11.50 m. to 12.00 m.13.45474.26377.99
34Earth work for well excavation-Soil lift from 12.00 m. to 12.50 m.13.15489.46435.61
35Earth work for well excavation-Soil lift from 12.50 m. to 13.00 m.12.88504.66499.248
36Earth work for well excavation-Soil lift from 13.00 m. to 13.50 m.12.61519.86554.678
37Earth work for well excavation-Soil lift from 13.50 m. to 14.00 m.12.335356596.55
38Earth work for well excavation-soil lift from 14.00 m. to 14.50 m.12.04550.26624.408
39Earth work for well excavation-Soil lift from 14.50 m. to 15.00 m.11.78565.46660.412
Total Activity 377000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL0.481200576
240 M.M. METAL000
3boldar10.8137.51485
4Cement(bori)202505000
5Contagecny000
6dewatering610006000
7MASON (PERDAY)203006000
8Masonry Stone447.6217.2497236.624
9P V C PIPE 21174174
10Photocopy & staionary120002000
11Sand2.187871715.66
12Transpotation Charges12481224812
13साईनबोर्ड 120002000
Total Material 147000