State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: KORATA
Work Code: 1711006051/LD/509 (शान्‍ि‍तधाम नि‍मार्ण कार्य /पि‍परि‍या /कोंरता )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 18/9/2011 Work start date : 25/9/2011
Present status : Not Exist Proposed Status : Development of Waste Land
Tech Sanction Details
Technical Sanction No. : 541/2 Sanction Date : 18/10/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
246000 93000 0 0 0 0 0 93000 0 339000
Financial Sanction Details
Financial\Administrative Sanction No: 06/2 Financial\Administrative Sanction Date 20/10/2011
Fin. Sanc. Amt. (in Rs) NREGA:339000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
339000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Site clearance, cutting grass, raking into heaps and removing off the premises40001.66400
3Labour only for item no.040225035.88950
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)103089.930899
5Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used10169.41694
6False work for R.C.C. and P.C.C. work in plinth and foundation10164.11641
7Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.351043.636526
8Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.5058.12905
9Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars30054.416320
10TRANSPORTATION OF MATERIAL161111.561111.5
11Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing2583.12077.5
12Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.30082.724810
13Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.725023.65900
14Labour only for item 2310250261.865450
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work50081.240600
16Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil13589.612096
17Collection of hard moorum including stacking at quarry.150130.819620
Total Activity 339000
S.NoMaterialQuantityUnit PriceTotal
11904-Transportation of hard mo201242480
2Board120002000
3CEMENT.82802240
4Chabutra Nirman work with shan11674616746
5Gate11200012000
6IRON SARIYA50603000
7PhotoCopy & Stationary1500500
8Photograph1500500
9Plant42301260
10Sand1640640
11Transportation charges11000010000
12Transportation of Boulder21018338430
13कारीगर122673204
Total Material 93000