S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 4000 | 1.6 | 6400 |
3 | Labour only for item no.0402 | 250 | 35.8 | 8950 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 10 | 3089.9 | 30899 |
5 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 10 | 169.4 | 1694 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 10 | 164.1 | 1641 |
7 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 35 | 1043.6 | 36526 |
8 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 50 | 58.1 | 2905 |
9 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 300 | 54.4 | 16320 |
10 | TRANSPORTATION OF MATERIAL | 1 | 61111.5 | 61111.5 |
11 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 25 | 83.1 | 2077.5 |
12 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 300 | 82.7 | 24810 |
13 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 250 | 23.6 | 5900 |
14 | Labour only for item 2310 | 250 | 261.8 | 65450 |
15 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 500 | 81.2 | 40600 |
16 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil | 135 | 89.6 | 12096 |
17 | Collection of hard moorum including stacking at quarry. | 150 | 130.8 | 19620 |