Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 06:51:50 PM 
Back  
State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Baksana
Work Code: 1722005003/WC/22012034670475 (CTRA Roof top water harvestig E- Panchayat Bhawan Baksana)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2021 Work start date : 20/4/2021
Present status : Existing Proposed Status : Constr of Sand filter - openwell recharge for Comm
Tech Sanction Details
Technical Sanction No. : 1722005/2021-2022/169881/TS Sanction Date : 22/4/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
5032.27 17846.57 754.51 807.16 0 0 0 19500 0 24440.51
Financial Sanction Details
Financial\Administrative Sanction No: 1722005/2021-2022/169881/AS Financial\Administrative Sanction Date 22/4/2021
Fin. Sanc. Amt. (in Rs) NREGA:24440 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
24500
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(j) Cement mortar 1:6 (1cement, 6sand)1.843873.858695652177127.9
2(d) Cement mortar 1:6 (1cement, 6sand)17.2101.7389534883721749.91
3Providing and fixing on wall face unplasticised Rigid PVC Rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. (ii) 110 mm diameter (minimum wall thickness 2.2mm)30231.1003333333336933.01
4(b) Dense or hard soil7.74148.2571059431521147.51
5(c) Hard moorum3.6176.544444444444635.56
6Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.3.2163.56875523.42
7Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.3.2228.121875729.99
8Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.3.2185.375593.2
Total Activity 19500
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.028888525.488
20367-Portland Cement0.14395511793.0329
30983-Fine sand (zone IV)0.61591076.25662.862375
410-Miscellaneous /Contingencies charges150005000
57900-Modular common burnt clay bricks of class designation 7.5956.84.133951.584
6MR11640-uPVC Pipe (Working Pressure 4kg/cm square) single socketed pipe 110mm dia301604800
7MR11641-uPVC Pipe (Working Pressure 4kg/cm square) rubber (seal) ring 100mm dia525125
Total Material 15400