State: MADHYA PRADESH District: KATNI Block: DHIMERKHEDA Panchayat: PADRBHATA
Work Code: 1744006059/WC/22012034928331 (Talab jirnoddhar kary bihari kol ke khet pass badkheda)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/1/2022 Work start date : 24/3/2022
Present status : Existing Proposed Status : Repair & maint of Community Ponds for Comm
Tech Sanction Details
Technical Sanction No. : 5488 Sanction Date : 15/1/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Beneficiary Contribution scheme2 scheme3 Total
581000 277000 0 0 50000 0 0 327000 0 908000
Financial Sanction Details
Financial\Administrative Sanction No: 2640bkheda Financial\Administrative Sanction Date 17/3/2022
Fin. Sanc. Amt. (in Rs) NREGA:858000 Beneficiary Contribution
50000
Scheme 2
0
Scheme 3
0
Total
908000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard136003600
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.29006.5418966
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil1834134.19246104.46
4Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil60173.7810426.8
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)353162.89110701.15
622cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.525138.9672954
7Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.157.5289.8945657.675
8Transportation of metal 58589.8952585.65
9Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.157.5114.2817999.1
1022cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014683.1352.67240908.877
11Lossening of hard soil by ploughing the existing gound1129.123.64064.832
12Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed1129.1273.6783182.2704
Total Activity 908000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL000
2Cement000
3Display board136003600
4pitching stone114.28683.178064.668
5Sand000
6Transporation of Boulder114.28150.2817173.9984
7Transpotation Charges320114.2836569.6
8Transpotation of Puddle Earth790.75241.54190997.755
Total Material 327000