S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Hard rock requiring blasting | 525 | 541.665028571429 | 284374.14 |
2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 100 | 58.5178 | 5851.78 |
3 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 1.6 | 3175.78125 | 5081.25 |
4 | Labour only for dressing stones hammer or rough dressed for C. R. masonry work second sort. | 300 | 525.8455 | 157753.65 |
5 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 300 | 86.6848333333333 | 26005.45 |
6 | (VI) 3.0 Km. Lead | 30 | 139.893333333333 | 4196.8 |
7 | c (iii) Hard moorum for Tank Work | 268.8 | 181.559933035714 | 48803.31 |
8 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 600 | 163.5675 | 98140.5 |
9 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3644.01 | 3644.01 |