S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1500 | 7.02 | 10530 |
2 | Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works) | 480 | 194 | 93120 |
3 | Thick shrub jungle (area above 50% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting out (for survey works) | 650 | 172 | 111800 |
4 | Labour only for lime mortar & lime surkhi mortar | 1 | 314542 | 314542 |
5 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 885 | 144 | 127440 |
6 | Coursed rubble masonry second sort in plinth and foundation.-In Lime mortar 1:3 (1lime putty, 3sand) | 8523 | 152 | 1295496 |
7 | Labour only for item no.1103 and 1104 | 510 | 0.4 | 204 |
8 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 200 | 199.34 | 39868 |