Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 24-Jun-2024 07:12:47 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: BADGAON PIPLOD
Work Code: 1725007005/IF/1000057390 (कपिल धारा कूप निर्माण सह मेंड बंधान कार्य दशरथ बाब)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/10/2013 Work start date : 1/12/2013
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1443qq Sanction Date : 1/10/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
142000 93000 0 0 0 0 0 93000 0 235000
Financial Sanction Details
Financial\Administrative Sanction No: 20qq Financial\Administrative Sanction Date 12/12/2013
Fin. Sanc. Amt. (in Rs) NREGA:235000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
235000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil4.581.2365.4
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum997.7879.3
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)9234.32108.7
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting4.5302.81362.6
5Dag-beling-Single spade stroke minimum 75mm deep6000.2120
6Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead70.3121.91539.789
7Labour only for item no.040254.9535.81967.21
8Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.29341821499.22
9False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift118.44199.723652.468
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars197.3965.913008.001
11Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil25.1290.12263.312
12Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum50.24117.15883.104
13Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)50.24289.0114519.8624
14Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.176.11526.6692750.0926
15Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)98.28115.3311334.6324
16Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work70.3189.66299.776
17Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Loose or soft soil for Tank Work70.3191.36419.303
18work charge12902729027
Total Activity 235000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.612007200
2Blasting (No)34010034000
3BULLOCK CART000
4Cement(bori)4030012000
5Centering and Shuttering118.4410011844
6desal pump rent126007200
7Display board120002000
8MASON (PERDAY)123003600
9PhotoCopy & Stationary28256
10Photograph425100
11Sand410004000
12STEEL2005010000
13Transpotation Charges25001000
Total Material 93000