Work Code: 1702001014/RC/22012034296288 (Graval road from Main road Chitavali to Nahar aashram)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2015 Work start date : 13/1/2016
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 2711/64 Sanction Date : 24/12/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
877500 526500 0 0 0 0 0 527000 0 1404000
Financial Sanction Details
Financial\Administrative Sanction No: 64/2711 Financial\Administrative Sanction Date 28/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:1404000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1404000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.81004.435640
3Chain and compass survey.-Canals/Roads0.9639575.1
4Fly levelling for fixing temporary bench marks.-Above 15 m interval0.9477429.3
5Levelling - Headwork.-Below 5 m interval0.915901431
6Levelling - Headwork.-Above 15 m interval0.9508.8457.92
7Stacking and boxing.-Moorum or sand540158100
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1540000540000
9Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN5407138340
10Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making215631.267267.2
11Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor268932.787930.3
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work494088.4436696
13Collection of hard moorum including stacking at quarry.540142.576950
14R C C Pole Fixing only54087.747358
15contingency16030060300
Total Activity 1404000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work215631.267267.2
2Compaction of GSB5407138340
3Compaction of Selected soil268932.787930.3
4contangency and work charges13500035000
5Kilometre Stone (200 M)43341336
6Kilometre Stone (ordinary)26871374
7Transpotation Charges1295000295000
Total Material 527000