S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Labour only for cement lime mortar | 1 | 14200 | 14200 |
2 | Labour only for item no. 1262 | 9.8 | 148 | 1450.4 |
3 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 14.6 | 271.3 | 3960.98 |
4 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 2.18 | 1374 | 2995.32 |
5 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 1 | 19000.3 | 19000.3 |