S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Excavating post holes (or similar holes) upto 0.5cum including getting out the excavated soil, than returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc., disposing of-Dense or hard soil | 1 | 10800 | 10800 |