Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 05:34:27 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: TEHRA
Work Code: 1713004025/WC/22012034803714 (रिचार्ज पिट निर्माण रामबदन सोनी के घर के पास )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2021 Work start date : 20/7/2021
Present status : Non-existent Proposed Status : Construction of Recharge Pits for Community
Tech Sanction Details
Technical Sanction No. : 289/25/2021 Sanction Date : 17/6/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
4000 0 0 0 15800 0 0 15800 0 19800
Financial Sanction Details
Financial\Administrative Sanction No: 03/25/2021 Financial\Administrative Sanction Date 18/6/2021
Fin. Sanc. Amt. (in Rs) NREGA:4000 15th Finance Commission
15800
Scheme 2
0
Scheme 3
0
Total
19800
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil27148.334004.91
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m2758.511579.77
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)000
4Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand)1.123911.34380.656
5Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.13.5163.572208.195
6Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.6.75228.111539.7425
7Transportation of metal 148004800
8Collection of river Borne material (RBM)(any mixture of sand & gravel)i/c boxing and all leads and lifts up to the loading point at quarry.6.75185.381251.315
Total Activity 19800
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount11580015800
Total Material 15800