S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 10 | 1000 | 10000 |
3 | Labour only for item no.0402 | 60.5 | 35.8 | 2165.9 |
4 | Labour only for item no. 0404 | 8.1 | 29.8 | 241.38 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 12.8 | 3089.9 | 39550.72 |
6 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 12.8 | 169.4 | 2168.32 |
7 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 2.85 | 223.8 | 637.83 |
8 | Brick bat filling in trenches or soak pits. | 2.55 | 248 | 632.4 |
9 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 140.5 | 2005 | 281702.5 |
10 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 1.05 | 2823 | 2964.15 |
11 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 205.8 | 54.4 | 11195.52 |
12 | 20mm thick cement plaster in two coat on rough side of wall in-Cement mortar 1:4 (1cement, 4sand) | 5.5 | 179.8 | 988.9 |
13 | Extra rate for finishing with a floating cot of neat cement slurry over cement plaster of any thickness. | 8.1 | 31.1 | 251.91 |
14 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:3 (1cement, 3sand)-Raised and cut pointing | 15.9 | 136.5 | 2170.35 |
15 | Rough chisel dressed sand stone flooring over 20mm average thick base of cement mortar 1:5 (1cement, 5sand) with joints finished flush (Area of each stone should not be less than 0.20 Sqm.)-With 40 mm thick stone | 56.8 | 371.5 | 21101.2 |
16 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 8.1 | 112.8 | 913.68 |
17 | Labour only for boulder soling hand packed excluding consolidation. | 10.8 | 106.2 | 1146.96 |
18 | Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal grading-2 & 3 as per MOST 2004 clause 400.2.5 including dressing. | 8.1 | 55.7 | 451.17 |
19 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 44.5 | 90.1 | 4009.45 |
20 | Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 260.9 | 7.1 | 1852.39 |
21 | Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m | 132.05 | 12.9 | 1703.445 |
22 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 260.9 | 119.7 | 31229.73 |
23 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 132.05 | 353.2 | 46640.06 |
24 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work | 70.5 | 477.2 | 33642.6 |