S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva | 500 | 300 | 150000 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 40000 | 1 | 40000 |
3 | Deduct from items 0102 for uprooting not done. | 1 | 5000 | 5000 |
4 | Lime Surkhi Mortar 1:1:1 ( 1 lime putty, 1 surkhi, 1sand ) | 3488.25 | 132 | 460449 |
5 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 1000 | 50.2 | 50200 |