State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Aamkho
Work Code: 1722005067/RC/22012034218666 (खेत सडक पटेलपुरा बिल्‍यादेह से शोभाराम के खेत तक ग)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 3/3/2014 Work start date : 4/3/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1048 Sanction Date : 3/3/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
660000 828000 0 0 0 0 0 828000 0 1488000
Financial Sanction Details
Financial\Administrative Sanction No: 88/13-15 Financial\Administrative Sanction Date 4/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:1488000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1488000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard159345934
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.57004.123370
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead487.3587.642691.86
4Filling foundation and around masonry work with moorum I/c ramming layers and watering.140.34145.420405.436
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)196.922190431254.8
6False work for R.C.C. and P.C.C. work in plinth and foundation396.27127.150365.917
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars31.567.82135.7
8Chain and compass survey.-Canals/Roads0.95584554.8
9Fly levelling for fixing temporary bench marks.-Above 15 m interval0.95438416.1
10Levelling - Headwork.-Below 5 m interval0.9514601387
11Levelling - Headwork.-Above 15 m interval0.95467.2443.84
12Stacking without boxing.-Puddle earth, moorum, sand or kankar1137.1510.511940.075
13Transportation of metal 1137.15121.5138163.725
14Transportation rates for Lime (fat), Hydraulic or any other.570176.4100548
15Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.1137.154146623.15
16Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia40310.212408
17Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.182819.950758.2
18Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making924.6818.316921.644
19Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1859.1519.836811.17
20Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work2915.9381.2236773.516
21Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil84.27108.19109.587
22contingency14054240542
23Labour difference in case of old SoR13500035000
24Collection/Excavation of Gravel Material meeting the requirements of Hard moorum as detailed in RES SOR chapter No. 03 Notes Clause 3.2(C) including stacking and all leads and lifts up to the loading point at quarry.342130.844733.6
25Collection of river Borne material (RBM)(any mixture of sand & gravel)i/c boxing and all leads and lifts up to the loading point at quarry.228114.326060.4
26Stacking of Gravel or Hard Moorum at site without Boxing.57025.614592
27Spreading of material mixing by mix in place method by manual means or by tractor mount disk harrows to meet the requirements of Grading and Plasticity given in clause 2.2.2.2,2.2.2.3,2.2.3.1 and 2.2.3.2 of IRC SP: 77-2008 and grading by tractor mount.57080.545885
28Rolling & Compaction of granule sub-base of well graded-material Spreading in unformed layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC and compacting with Smooth wheel rollers of 80 to 100 KN static weight to achieve the desired density, complete as pet Technical Specification Clause 401 of Specification for Rural Roads i/c all leads of water etc, complete.57061.535055
29Setting out work (Reference pillars referencing bench mark and temporary bench mark):Painting/Marking of Reference/Working Bench Mark over existing permanent structure Fixing of Reference pegs made of local rough wood for making centre line and toe lines. Fixing of reference poles made of bamboos or jungle wood bellies etc.0.957462.97089.755
Total Activity 1488000
S.NoMaterialQuantityUnit PriceTotal
1BGSY Information Board in Ceme159345934
2contangency and work charges16054260542
3hume pipe61240874448
4Kilometre Stone (200 M)140844084
5roller 8 to 10801600128000
6setting out work5709035450
7Survey & Investigation0.9538003610
8Transportanion of hard Muram597500298500
9Transportation of GSB219800175200
10WATER TENKAR8450042000
Total Material 828000