S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 2.13 | 2204.6 | 4695.798 |
2 | Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-40 mm thick | 16.2 | 245.7 | 3980.34 |
3 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:3 (1cement, 3sand) | 0 | 0 | 0 |
4 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 6.04 | 2997 | 18101.88 |
5 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 211 | 71.4 | 15065.4 |
6 | Collection of puddle earth including stacking at quarry | 172.8 | 98.3 | 16986.24 |
7 | Transportation of metal | 172.8 | 34.29 | 5925.312 |
8 | Loading of metal in truck, dumper etc. | 172.8 | 28.62 | 4945.536 |
9 | Unloading of metal in truck, dumper etc. | 172.8 | 14.31 | 2472.768 |
10 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 0 | 0 | 0 |
11 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 498.24 | 96.2 | 47930.688 |
12 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum | 446.4 | 117.8 | 52585.92 |
13 | contingency | 1 | 43400 | 43400 |
14 | Applying chemicles in soil around plants Mandays per hundred. | 1521 | 167 | 254007 |
15 | Layout of Field for per digging of pits for plantation work. | 4000 | 0.5 | 2000 |
16 | Preperation of pits for plantation of poly plants including mixing of soil manure fertilizer and insecticides with first watering etc. complete. | 1600 | 10 | 16000 |
17 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants. | 8000 | 45 | 360000 |
18 | Supply of farm yard mannure (FYM) to the plantation site. | 2080 | 7.5 | 15600 |
19 | Supply of vermi compost | 800 | 5.75 | 4600 |
20 | Supply of singal super phosphate (SSP) | 520 | 6.08 | 3161.6 |
21 | Supply of muriate of potash (MOP) | 260 | 16.98 | 4414.8 |
22 | Supply of urea. | 460 | 6 | 2760 |
23 | Supply of Neem cake | 416 | 20 | 8320 |
24 | Supply of Themate, phorate 10 G pesticites | 52 | 65 | 3380 |
25 | Supply of foresty or horticulture Plant cost 3 to5 feet . height | 2080 | 40 | 83200 |
26 | Rent for water Tankar of capacity 5000 Litre including tractor, diesel, driver etc. complete for one day. | 115 | 1600 | 184000 |