State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: DANGICHA
Work Code: 1719006032/DP/22012034233096 (Samudayik vriksharopan baldipar GP dangicha)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 4/5/2016 Work start date : 22/7/2016
Present status : Not Exist Proposed Status : Plantation
Tech Sanction Details
Technical Sanction No. : 32/02/2016 Sanction Date : 4/7/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
765000 393000 0 0 0 0 0 393000 0 1158000
Financial Sanction Details
Financial\Administrative Sanction No: 32/02/2016 Financial\Administrative Sanction Date 5/7/2016
Fin. Sanc. Amt. (in Rs) NREGA:1158000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1158000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)2.132204.64695.798
2Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-40 mm thick16.2245.73980.34
3Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:3 (1cement, 3sand)000
4Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)6.04299718101.88
5Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height21171.415065.4
6Collection of puddle earth including stacking at quarry172.898.316986.24
7Transportation of metal 172.834.295925.312
8Loading of metal in truck, dumper etc.172.828.624945.536
9Unloading of metal in truck, dumper etc.172.814.312472.768
10Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.000
11Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil498.2496.247930.688
12Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum446.4117.852585.92
13contingency14340043400
14Applying chemicles in soil around plants Mandays per hundred.1521167254007
15Layout of Field for per digging of pits for plantation work.40000.52000
16Preperation of pits for plantation of poly plants including mixing of soil manure fertilizer and insecticides with first watering etc. complete.16001016000
17All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants.800045360000
18Supply of farm yard mannure (FYM) to the plantation site.20807.515600
19Supply of vermi compost8005.754600
20Supply of singal super phosphate (SSP)5206.083161.6
21Supply of muriate of potash (MOP)26016.984414.8
22Supply of urea.46062760
23Supply of Neem cake416208320
24Supply of Themate, phorate 10 G pesticites52653380
25Supply of foresty or horticulture Plant cost 3 to5 feet . height20804083200
26Rent for water Tankar of capacity 5000 Litre including tractor, diesel, driver etc. complete for one day.1151600184000
Total Activity 1158000
S.NoMaterialQuantityUnit PriceTotal
140 M.M. METAL1.819001629
2Bricks30204.513590
3Cement352709450
4contigency14140041400
5Fartilizer (Gobar Khad)20807.515600
6Fartilizer (Potash)26016.984414.8
7Fartilizer( Super Fasfed)5206.083161.6
8Flag Ston16.2245.73980.34
9IRON GATE 221171.415065.4
10Neem Khali416208320
11Plant20804083200
12Sand310003000
13Transportation charges1151600184000
14Urea46062760
15फोरेट52653380
Total Material 393000