Work Code: 1734004008/RC/22012034222728 (khet sadak nirman karya imaliya)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 25/5/2014 Work start date : 24/6/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 92/14-15 Sanction Date : 20/6/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
456500 305500 0 0 0 0 0 306000 0 762000
Financial Sanction Details
Financial\Administrative Sanction No: 7/14-15 Financial\Administrative Sanction Date 21/6/2014
Fin. Sanc. Amt. (in Rs) NREGA:762000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
762000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency17700077000
2Work charge27901130690
3Stacking without boxing.-Puddle earth, moorum, sand or kankar1949.510.520469.75
4Transportation of metal 1576119.88188930.88
5Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.373.5152.3756910.195
6Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact1949.530.258874.9
7Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:124.536044820
8Collection of soft moorum including stacking at quarry.1949.5112.8219903.6
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.12.8498063744
Total Activity 762000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of GSB373.530.211279.7
2Compaction of Selected soil157630.247595.2
3contangency and work charges13250032500
4Gravel or moorum124.536044820
5Transportanion of hard Muram112.95373.542186.825
6Transportation Of Selected Soi157680.46126804.96