The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:00:05 AM 
Back  
State: MADHYA PRADESH District: HARDA Block: HARDA Panchayat: DAGAWANSHANKAR
Work Code: 1743002026/RC/22012034288877 (आंतरिक पथ निर्माण ग्राम घोगडामाफी में गुहाली मार्ग से कैलाश कहार के खेत की ओर 800 मी. रोड)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2015 Work start date : 7/11/2015
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 26/164 Sanction Date : 23/10/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
949000 536000 0 0 0 0 0 536000 0 1485000
Financial Sanction Details
Financial\Administrative Sanction No: 26/7 Financial\Administrative Sanction Date 7/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:1485000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1485000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises80001.612800
2Dag-beling-Double spade "v" shaped stroke 100mm deep24000.51200
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)6.752498.616865.55
4Transportation of metal 2808115.83325250.64
5Transportation of metal 396115.8345868.68
6Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.22.5555.2412492.9
7Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7320446147384
8Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.22.54341.697686
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making475231.6150163.2
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work237691.2216691.2
11Collection of soft moorum including stacking at quarry.2808126.7355773.6
12Collection of hard moorum including stacking at quarry.39614758212
13contingency44612144612
Total Activity 1485000
S.NoMaterialQuantityUnit PriceTotal
11904 tranportion of rcc hum pi22.51163.0626168.85
2Cement6.752004.213528.35
3contangency and work charges15159351593
4pf RCC hume pipe 100022.54148.193332.25
5Rolling Earth & moorum475225.28120130.56
6Transportanion of hard Muram39671.5528333.8
7Transportanion of Soft Muram280871.55200912.4
8बोर्ड120002000
Total Material 536000