Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:54:13 AM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: GADHOTA(P)
Work Code: 1703004021/RC/22012034184390 (मोरमीकरण रतीराम के खेत से रठा की ओर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2013 Work start date : 20/9/2013
Present status : Earthern road Proposed Status : Mitti Murram Road
Tech Sanction Details
Technical Sanction No. : 21/227 Sanction Date : 17/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
197702 125290 0 0 0 0 0 126000 0 322992
Financial Sanction Details
Financial\Administrative Sanction No: 21/08 Financial\Administrative Sanction Date 20/7/2013
Fin. Sanc. Amt. (in Rs) NREGA:322992 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
323000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency115700.615700.6
2Dag-beling-Single spade stroke minimum 75mm deep4000.280
3Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.540191.16103226.4
4Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN99069.769003
5Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work22581.218270
6Collection of hard moorum including stacking at quarry.540130.870632
7Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.360012.846080
Total Activity 323000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Muram54028.715498
2contangency and work charges11565.61565.6
3PhotoCopy & Stationary20051000
4SIGN BOARD NO140004000
5Transportation of Muram540191.16103226.4
Total Material 126000