S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Contingency | 1 | 18350 | 18350 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 400 | 0.2 | 80 |
3 | Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-30 mm thick | 280 | 218.6 | 61208 |
4 | Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar. | 600 | 215.7 | 129420 |
5 | Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite. | 90 | 475.3 | 42777 |
6 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 90 | 159.66 | 14369.4 |
7 | Transportation rates for Masonry stone. | 90 | 444.36 | 39992.4 |
8 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 90 | 35.8 | 3222 |
9 | Collection of hard moorum including stacking at quarry. | 90 | 112.8 | 10152 |
10 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil. | 600 | 12.8 | 7680 |