State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: PRATAPPURA
Work Code: 1702001079/FP/22012034624059 (Nala Nirman Karya Shankar Ji Mandir Se Talab Ki Or, Pratappura)
Work Category: Other Works
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2021 Work start date : 21/3/2021
Present status : Weak Embankment Proposed Status : Constr of Flood/ Diversion Channel for Community
Tech Sanction Details
Technical Sanction No. : 303/20 TS Sanction Date : 19/3/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
73707 0 0 0 225789 0 0 226000 0 299496
Financial Sanction Details
Financial\Administrative Sanction No: .15/303/20 Financial\Administrative Sanction Date 22/3/2021
Fin. Sanc. Amt. (in Rs) NREGA:73707 15th Finance Commission
225789
Scheme 2
0
Scheme 3
0
Total
300000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m162396318
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)383194.2121379.6
3False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift331195.464677.4
4Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars149.150.87574.28
5Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.32269.78630.4
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.16525065250
7Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work110.2588.259729.5625
8Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil100.6296.29679.644
9Field Technical Supervisior Charge-FTSC159505950
Total Activity 300000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1225789225789
Total Material 226000