State: MADHYA PRADESH District: KATNI Block: DHIMERKHEDA Panchayat: PADRBHATA
Work Code: 1744006059/RC/22012034295436 (खेत सड़क निर्माण कार्य चैनू नगर से हरी सिह के खेत की ओर )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 3/10/2015 Work start date : 5/1/2016
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1758/059 Sanction Date : 3/12/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
801000 548000 0 0 0 0 0 548000 0 1349000
Financial Sanction Details
Financial\Administrative Sanction No: 22/059 Financial\Administrative Sanction Date 4/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:1349000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1349000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises30001.54500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.60003.722200
3Contingency1115000115000
4Work charge15000050000
5Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead797.223.618813.92
6Chain and compass survey.-Canals/Roads1528528
7Fly levelling for fixing temporary bench marks.-Above 15 m interval1396396
8Levelling - Headwork.-Below 5 m interval113201320
9Levelling - Headwork.-5 to 10 m interval115701570
10Stacking without boxing.-Puddle earth, moorum, sand or kankar174011.319662
11Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1740164.3285882
12Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.290044.3128470
13Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia4031212480
14Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making159422.235386.8
15Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor174023.340542
16Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to Table 2.2 of IRC:SP:77-2008, having Liquid Limit less than 25 and Plasticity inde270729.3196911
17Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:90649.258428
18Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work159487.3139156.2
19Collection of soft moorum including stacking at quarry.1740121.3211062
20SIGN BOARD160006000
Total Activity 1349000
S.NoMaterialQuantityUnit PriceTotal
12043 soil Compaction material159422.235386.8
22045-compection of hard solder174023.741238
32048-Construction of gravel ba260588.8153088
42049-Construction of gravel su90508.545765
5BGSY SIGN BOARD (600X600MM)160006000
6Compaction of Earth Work79723.618809.2
7Compaction of Selected soil000
8contigency120002000
9HumePipes300026000
10Kilometre Stone (200 M)102302300
11Kilometre Stone (ordinary)2334668
12Transportation Of Selected Soi1440164.3236592
Total Material 548000