S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 4353 | 4353 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 31.3 | 65 | 2034.5 |
4 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 180 | 0.5 | 90 |
5 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 31.3 | 539.1 | 16873.83 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 28.46 | 3089.9 | 87938.554 |
7 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 28.46 | 169.4 | 4821.124 |
8 | False work for R.C.C. and P.C.C. work in plinth and foundation | 32.1 | 164.1 | 5267.61 |
9 | TRANSPORTATION OF MATERIAL | 1 | 25593 | 25593 |